Eliminate on-site conflicts and ensure seamless project delivery with our expert MEP coordination and Clash Detection. We act as a central hub for building services integration, empowering general contractors, MEP firms, and developers by transforming complex designs into a unified, constructible model. Our dedicated team utilizes advanced BIM MEP coordination to produce clash-free 3D BIM Modeling and bankable MEP coordination drawings. We ensure every system is perfectly integrated, reducing costs and accelerating timelines through our meticulous MEP coordination and Clash Detection.
Our team runs systematic interference checks as the core of our MEP coordination and Clash Detection.
Step 1: Discovery and Model Intake
Typical Duration: 3-5 business days.
Step 2: Federated Model Creation and Setup
Typical Duration: 5-9 business days.
Step 3: Systematic Clash Detection and Analysis
Typical Duration: 12-18 business days.
Step 4: Collaborative Resolution and Design Refinement
Typical Duration: 7-11 business days.
Step 5: Coordinated Deliverables and Construction Support
Typical Duration: 3-5 business days.







The primary goal of MEP coordination and Clash Detection is to digitally build and validate a project before physical construction begins, finding and fixing all conflicts to ensure a smooth, cost-effective process.
A "hard clash" is a direct physical conflict where two objects occupy the same space (e.g., a pipe running through a beam). A "soft clash" or "clearance clash" is a violation of a required spatial or geometric tolerance, such as the required maintenance access space around a piece of equipment. Our clash detection services identify both.
Our primary toolset includes Autodesk Revit for MEP 3D modeling, Autodesk Navisworks Manage for advanced clash detection services, and Solibri for quality and compliance checking. We also use cloud platforms like BIM 360 for seamless collaboration with the entire project team.
MEP coordination drawings are a set of composite construction documents derived from the final, clash-resolved 3D model. They show how all building services are integrated and routed in relation to each other and the building structure, providing a clear guide for installation teams.
The timeline for MEP coordination and Clash Detection depends on project complexity but typically ranges from 3 to 16 weeks.
Absolutely. We often create a 3D model of the existing conditions from laser scans (Scan-to-BIM) and then coordinate the new MEP systems within that context. This is crucial for avoiding conflicts with existing structures and services in renovation projects.
Key deliverables include a clash-free federated 3D model (NWD/IFC), a complete set of 2D MEP coordination drawings (PDF/DWG), detailed clash reports documenting the resolution process, and an updated as-built model upon project completion.
It dramatically reduces costs by virtually eliminating the need for on-site rework and change orders caused by system clashes. It also allows for more prefabrication, reduces material waste, and accelerates the construction schedule, all of which lead to significant financial savings.
Yes. True BIM MEP coordination involves integrating with all relevant disciplines. We routinely coordinate with fire protection, structural steel, architectural finishes, and even specialized equipment vendors to ensure a holistically integrated building design.
As a neutral third-party coordinator, our role is to facilitate data-driven decisions. We present the conflict, propose multiple viable solutions based on engineering principles and best practices, and help the project team arrive at the most efficient and cost-effective resolution for the project as a whole.